Sökresultat:
2685 Uppsatser om Road-side construction - Sida 1 av 179
Klimatpåverkan vid vägbyggnad -beroende av vald konstruktion
It?s a fact that the climate is affected by the vehicle that runs on the worlds roads. But theconstruction of the road itself is rarely thought of as a climate threat. Svevia and the Swedish roadadministration have opposite views of how the construction of roads should be carried thru. It?sthe difference between those two construction methods that is the base in our thesis.The amount of energy use or the emissions are not analyzed for neither the Swedish roadadministrations nor Svevias construction models.
Drivarens produktivitet vid lossningsarbete :
During the last few years the harwarder has developed from a prototype into a market product. Holmen Skog owns two harwarders and uses two more owned by entrepreneurs. In previous studies it has been shown that the harwarder was a slow and expensive forwarder. In this study the unloading at road-site was studied. The goal was to describe the differences in time consumption between unloading two-sided or single-sided (only from side of the road) and also the difference between unloading with three and four assortments in the carrier.
Värdering av föroreningsrisk - Ett förslag till angreppssätt för värdering av föroreningsrisk till följd av emission från en vägkonstruktion
When constructing a road the risk of emission of substances from the used materials to the surrounding environment has to be evaluated. The aim of this study is to present a proposal for how to evaluate the risk of contamination as a result of emission from the materials in a road construction. The study is based on literature studies, an inventory and a questionnaire that examines how experts in governmental agencies, industries and universities evaluate the risk of contamination. The inventory indicates that guidelines for evaluating the risk of emission from secondary materials in a road construction do not exist. The conclusions from the questionnaire are: that there is no common way to evaluate the risk of contamination as a result of emission from materials in the road construction, there is no uniform interpretation of the terms "minor" and "significant" risk of contamination and that the evaluation is subjective.
Vägparametrar och deras inverkan på trafiksäkerheten : Fallstudie på länsväg 360 Lycksele - Vilhelmina
The interaction between the driver, the car and the road is essential for the road safety. This case study focuses on the road condition and its effect regarding road safety issues. By studying and isolating the road condition aspect and its contributing role to the accident occurrence, the aim is to explore their relationship, as well as highlight the road parameters that are commonly associated with accident occurrence. This result will be used to develop and increase awareness of the impact of poor road alignment and poor road surface conditions on traffic safety, in order to prevent these accidents from occurring. The road parameters chosen for this study include side friction, cross slope and rut bottom cross slope, road texture, curvature, drainage gradient and rutting.The case study was limited to lv 360 in Va?sterbotten, where all accidents with an unclear cause of the accident were studied, between 2003 and 2012 were carefully studied and assessed based on the condition of the road at the time of the accident.
Gabioner - Ett alternativ vid vägbanksbygge i lösa leror
The use of gabions means a reduced amount of filling material in the road section and a more narrow construction. Also the use of limestone cement columns can be reduced. All together this results in lower costs. The columns stand for about 55% of the total costs for the road. If gabions are used you can reduce the total costs with over 10%..
Vägprojekt: nya E4:an, delsträckan mellan Uppsala och Läby : Så gick besluts- och samrådsprocessen till
A Road project?s frame is built up of a decision- and consultation process, where the results of the preparatory studies are being discussed. The aim with a consultation process is that all theopinions and knowledge from the operators' will be taken into count in the basis of information, that is needed in order to the different involved operators' to take a decision.The aim of the essay was to investigate how the decision- and consultation process for a road project, the E4 section between Uppsala Läby, turned out. The aim is also to bring up how theprocess could have been done more correctly. The study was carried out through a qualitative method with an analysis of materials from the National Road Administration's archives, the associated Environmental Impact Assessment (EIA) and through interviews of the different operators.My theoretical basis has been a Stakeholder Analysis and its principles, and theory about different executions of social planning.The result showed that the decision- and consultation process has been bursting in democracy and consideration taking of the different operators' opinions, has been poor from the developer?s, in this case the National Road Administration's, side.
Utformning av vägen och dess omgivning : med fokus på bilförarens upplevelser
This thesis focuses on the driver?s experience of the road and its surroundings. ?The view from the road? takes place every day and a high-quality ?road experience? is therefore a question of importance. Since cars made their breakthrough in the 1920-30, the approach to ?the driver experience? has varied notably.
Utvärdering av Skvallertorget i Norrköping
This thesis is an evaluation of the new traffic solution at ?Skvallertorget?. The innovative theory behind it is to increase traffic-safety by introducing insecurity feelings for road-users. The conclusion of the evaluation is that the newtraffic solution is well adjusted according to guidelines for municipal traffic planning. The evaluation also illustrates the conflict between traffic planners deliberate attempt to avoid clear information and the road users wish to get it.
Koldioxidutsläpp vid vägbyggnad - en fallstudie med jämförelse av alternativa byggnadssätt
Abstract This degree project examines how much carbon dioxide that emits during the construction phase of a road project. This is to make it possible to compare how the amount of carbon dioxide differentiates between traditional road construction and Swepave construction, which is PEAB?s alternative way to design roads. To make the comparison a calculation tool has been produced. To compare the amount of carbon dioxide emissions a reference project was needed.
Konstruktion av formkropp pa JAS 39 E/F Gripen
The aim of this work is to develop new conceptual designs for the fairings that are situated between the fin and the rear fuselage on the new version of the JAS 39 Gripen aircraft, called the Gripen E/F. The designs presented should show a profit in the form of lower weight. To achieve weight loss, the possibilities of using other construction materials other than those which are available at Saab today were studied. Therefore, a material survey was carried out in which the market for modern construction materials was studied to get an idea of today?s level of technology.
Application of Design for Safer Urban Roads and Junctions: Selected Countermeasures
Road design with focus to safety has been extensively developed in last decades in Nordic and some other EU countries with the main aim to achieve a decrease in a number of accidents and fatalities on the roads. These countries gained many valuable experiences, but they had to sacrifice great effort, expenses, and time to reach the present art-of-state. The purpose of the Master?s Thesis is to review some design approaches with focus to safety and discuss the general way that they may be applied. The Master?s Thesis studies safety in three levels: (i) general - design standards, national safety policies and road hierarchy; (ii) local authority and road administrator; and (iii) three specific safety countermeasures - junctions, pedestrian crossings and traffic calming.
Ämnestransport med grundvatten i hydrogeologiska typmiljöer
Certain types of waste, e.g. bottom ash originating from municipal solid waste incineration (MSWI bottom ash) can be used as road construction materials. A potential problem is the possibility of substances leaching out of the road and spreading in the surrounding groundwater.The aim of this master?s thesis is to conclude whether hydrogeological type settings can be employed to, based on local conditions, provide an estimate of the probable spreading of these substances in the surrounding groundwater, and whether certain types of soils can be identified as being less suitable for the localization of a MSWI bottom ash road. A hydrogeological type setting is defined as a mappable unit with similar hydrogeological properties.
Slitage på skogsbilvägar vid virkestransporter
This report discusses questions concerning wear on forest roads. The purpose of the work is to investigate if the wear on the roads will decrease when the speed limit gets lower for the trucks that transport the wood. A normal forest road, class B, was used in the study. In total 5000 m3f timber was transported on the road. Data about the road was measured with a profilograph car before and after the timber transport.
Giraffens blodtrycksreglering
Through previous studies during my education, I have experienced that chemical deicing road salt is a known problem, mainly in southern Sweden. Road salt causes damage to the environment and also damage to vehicles and structures such as bridges, etc. Road salt causes vehicles and steel constructions to rust, leading to increased costs for repairs of damage to structures. Road salt also causes damage to the plants and the economy to suffer, when plant material and soil needs to be replaced. In order to get closer to a solution, I put up three questions.
Arbetsmiljöansvar på en gemensam arbetsplats : En studie över hur arbetsmiljön samordnas på en byggarbetsplats med flera entreprenörer
This essay describes coordination of the work environment on construction sites where many entrepreneurs share workplace. As employer, the entrepreneur has main responsibility for the workers safety on the construction site, the project supervisor is responsible for the work environment, and to coordinate the work environment a coordinator of the construction work environment is appointed. The purpose of this essay is to describe how the work environment is ensured on a shared workplace. In order to answer the essays questions I?ve used a juridical method to interpret the law.